Petitioners 6.6.2011 Post CPG Filing

Post CPG Filing

01. Letter to  Vermont Public Service Board
02. Index  of Attachments
Attachment 01.  Attachment A - Description of Project Changes
Attachment 02a.  Final Civil (clean) Index to C-104
Attachment 02b.  Final Civil (clean) C-105 to C-110
Attachment 02c.  Final Civil (clean) C-111 to C-116
Attachment 02d.  Final Civil (clean) C-117 to C-124
Attachment 02e.  Final Civil (clean) C-125 to C-137
Attachment 03.  Final Civil Showing Turbine Pads and Crane Path (marked)
Attachment 04a.  Final Transmission (clean) Cover
Attachment 04b.  Final Transmission (clean) Page 2
Attachment 04c.  Final Transmission (clean) Pages 3-10
Attachment 04d.  Final Transmission (clean) Pages 11-20
Attachment 04e.  Final Transmission (clean) Pages 21-30
Attachment 05.  Final Transmission Showing Realignment (marked)
Attachment 06.  Exh. Pet.DPE.-17 (no change)
Attachment 07.  Collector Line Structure Details
Attachment 08.  Final Overhead Collector (clean)
Attachment 09.  Final Overhead Collector showing realignment (marked)
Attachment 10.  Laydown Yard Orthophoto (Roman Catholic Diocese)
Attachment 11.  Laydown Yard Orthophoto (Degre Auction House)
Attachment 12.  Jay #17 Temporary Substation Orthophoto
Attachment 13.  CI Agent Barrier Boom-Temporary Substation Oil Containment
Attachment 14.  CI Agent Polyvinyl Blankets-Temporary Substation Oil Containment
Attachment 15.  Secondary Containment Systems-Temporary Substation Oil Containment Geosynthetic Barrier
Attachment 16.  Jay #17 Substation Final Design
Attachment 17.  KCW Collector Substation Final Design
Attachment 18.  Lowell Switching Substation Final Design
Attachment 19.  Revised Overhead Collector Pole Heights
Attachment 20.  Revised Transmission Pole Heights
Attachment 21.  Aesthetics Report by David Raphael
Attachment 22.  Natural Resources Report by Jeffrey Nelson
Attachment 23.  Natural Resources Report by Jeffrey Wallin
Attachment 24.  Noise Report by Eddie Duncan/RSG, Inc.
Attachment 25.  Final Blasting Plan
Attachment 26.  Final Blasting Map
Attachment 27.  Budget
Attachment 28.  Collateral Permit Summary Table