Post CPG Filing
| 01. Letter to | Vermont Public Service Board |
| 02. Index | of Attachments |
| Attachment 01. | Attachment A - Description of Project Changes |
| Attachment 02a. | Final Civil (clean) Index to C-104 |
| Attachment 02b. | Final Civil (clean) C-105 to C-110 |
| Attachment 02c. | Final Civil (clean) C-111 to C-116 |
| Attachment 02d. | Final Civil (clean) C-117 to C-124 |
| Attachment 02e. | Final Civil (clean) C-125 to C-137 |
| Attachment 03. | Final Civil Showing Turbine Pads and Crane Path (marked) |
| Attachment 04a. | Final Transmission (clean) Cover |
| Attachment 04b. | Final Transmission (clean) Page 2 |
| Attachment 04c. | Final Transmission (clean) Pages 3-10 |
| Attachment 04d. | Final Transmission (clean) Pages 11-20 |
| Attachment 04e. | Final Transmission (clean) Pages 21-30 |
| Attachment 05. | Final Transmission Showing Realignment (marked) |
| Attachment 06. | Exh. Pet.DPE.-17 (no change) |
| Attachment 07. | Collector Line Structure Details |
| Attachment 08. | Final Overhead Collector (clean) |
| Attachment 09. | Final Overhead Collector showing realignment (marked) |
| Attachment 10. | Laydown Yard Orthophoto (Roman Catholic Diocese) |
| Attachment 11. | Laydown Yard Orthophoto (Degre Auction House) |
| Attachment 12. | Jay #17 Temporary Substation Orthophoto |
| Attachment 13. | CI Agent Barrier Boom-Temporary Substation Oil Containment |
| Attachment 14. | CI Agent Polyvinyl Blankets-Temporary Substation Oil Containment |
| Attachment 15. | Secondary Containment Systems-Temporary Substation Oil Containment Geosynthetic Barrier |
| Attachment 16. | Jay #17 Substation Final Design |
| Attachment 17. | KCW Collector Substation Final Design |
| Attachment 18. | Lowell Switching Substation Final Design |
| Attachment 19. | Revised Overhead Collector Pole Heights |
| Attachment 20. | Revised Transmission Pole Heights |
| Attachment 21. | Aesthetics Report by David Raphael |
| Attachment 22. | Natural Resources Report by Jeffrey Nelson |
| Attachment 23. | Natural Resources Report by Jeffrey Wallin |
| Attachment 24. | Noise Report by Eddie Duncan/RSG, Inc. |
| Attachment 25. | Final Blasting Plan |
| Attachment 26. | Final Blasting Map |
| Attachment 27. | Budget |
| Attachment 28. | Collateral Permit Summary Table |